Vestry Graduate

Image
I am no longer part of the Vestry at Christ Church Norcross. I served my full term as the Buidings and Grounds liaison. It was three years. There was a lot of items to deal with over the years. But the effort wasn't the work. It was the responsibility and knowing that I wasn't doing enough. I think most people get that feeling with obligations. Maybe not. I am sure the time and responsibility will be quickly reallocated. When I signed on I figured I would learn something. Now I am thinking about what I learned along with the hows and whys.
I been working on projects. One of the planes is in for its annual inspection. We found a small crack in the horizontal stabilizer. It is a involved repair to be sure. Lots for me to learn. The video is the procedure we are doing.





Comments

Popular posts from this blog

LavaCon 2025

Middle East 2022 trip