Vestry Graduate

Image
I am no longer part of the Vestry at Christ Church Norcross. I served my full term as the Buidings and Grounds liaison. It was three years. There was a lot of items to deal with over the years. But the effort wasn't the work. It was the responsibility and knowing that I wasn't doing enough. I think most people get that feeling with obligations. Maybe not. I am sure the time and responsibility will be quickly reallocated. When I signed on I figured I would learn something. Now I am thinking about what I learned along with the hows and whys.

I got the bobcat going again and I have almost all the holes drilled. I will be taking the auger back Monday morning. I still have to assemble the fence, fashion 4 gates and generally get the job done. I am gaining on it. It is amazing what you can get done when you are not studying for a class and working a full-time job.

We have our new llamas, two females named Rosey and Ultima. They settled in with the herd right away. The current animal count: 7 chickens, 6 llamas, and 2 cats.


Click pic for video


Comments

Popular posts from this blog

LavaCon 2025

Middle East 2022 trip